CIM 3.29 - September 2, 2022

Posted about 1 month ago by Wendy Acoin

W
Wendy Acoin Admin

ENHANCEMENTS

  • Integrity Compliance
    • Ability to target a Girth Weld in Analysis, include the targeted girth welds in a Dig Plan, as well as track repairs on these girth welds in the threat monitoring area
    • User can now look at girth weld alignment and pipe property changes in the Add Anomalies screen on the feature history table that a user can access by clicking on the "View all details" button or clicking on "Growth Rate" column for the anomaly.
    • Added new options in Operating Pressure dropdown when configuring analysis: MOP from ILI File, MAOP from ILI File
    • Added new option in Tool Tolerance dropdown when configuring analysis which will directly use the tolerance provided in Analysis Attributes
    • Added new burst pressure columns to Add Anomalies & Analysis Results grids: MAT-8 Burst Pressure, and B31G Burst & Safe pressures
    • Various new Integrity Compliance conditions to support ongoing implementation requirements
    • New Integrity Compliance attribute: Crack Depth Tolerance (mils)
    • New Integrity Compliance attribute: Crack Depth Saturation Limit
  • Metric Support
    • Added Metric system of measure support to the Repair Template export/import
    • Added Metric support to the Dig Feature Worklist report
    • Pass current System of Measure selection to Dig Feature Worklist report when invoked from Dig Management
  • System Management
    • Ability to selectively "Sync" individual system GIS data via System Management module
    • Ability to add/edit GIS ranges on segments in System Management
    • Ability to manually activate/inactivate a Segment in System Management
  • Condition Management
    • Per condition, users can now choose between different methods of determining Anomaly Due Dates for anomalies that hit those specific conditions during analysis.  This new option is located on the condition details screen.  Users will have the option to choose from:
      • Anomaly Remaining Life - CIM will use the earliest of ASME B318S, projected burst condition date, or projected depth condition date values for the anomaly as the due date
      • ASME B318.S response time - ASME B318S years + the assessment end date to calculate due date
      • Condition Category Response Days - this is the default selection and is how CIM has historically calculated Due Dates in the past.  This option uses the Response Days value set on the Condition Category to determine due date for the anomaly
  • Reporting
    • Dig Sheets
      • Added several new fields related to pipeline system hierarchy on Dig Sheet
      • Added GPS Origin Source field to Dig Sheet
    • Change Crack Unity Plot to be based on mils rather than % WT
    • Executive Summary & ILI Summary report tweaks
    • Tweaks & fixes to new "Integrity Summary" report
    • Run Comparison Report - add Event Name field
  • General
    • Make the TBL_APT_REF_VENDOR_TOOL_DAY table editable in Data Management - listed under table name "Vendor Reporting Time"
    • Only show "Active" user groups when creating or editing a user
    • Clean up AID_ASSESSMENT records when deleting historical repairs related to a specific assessment.

 

PRODUCT ROADMAP

  • Crack Management
    • New Crack-to-Crack ILI growth model alongside the existing Simplified Fatigue Analysis to estimate crack remaining life
    • New drop down menus to allow users to select from new Crack Growth Methodologies
  • Corrosion Management 
    • CP Annual Survey report data can now be loaded in Assessment Planning
    • Changed Corrosion Management templates to update template data if the Asset ID & Date fields match an existing record, rather than insert a duplicate
    • Finalize Corrosion Management module landing page
    • Added dual ILI orientation plots to compare 2 assessments
    • Various Atmospheric Corrosion Survey application updates
    • Created trends to analyze chemical program effectiveness
    • Added drill through function to view monitoring data above KPI's
    • Updated system level financials to track and rank chemical spend relative to the entire program

Available for those participating in the private preview or on commercial subscription

 

BUG FIXES

  • Fixed the Clock Orientation axis labels in the Internal Corrosion Dashboard
  • Fixed a bug where the "Reject Reason" field would not save properly when there are multiple tool technologies on an assessment
  • Fixed a bug where features with extreme length values could cause the joint view imagery to "stretch" beyond the actual length of the joint as defined by the US & DS girth welds
  • Fixed a bug where the Reference Point template load could fail when the reference point name is greater than 75 characters in length
  • Fixed a bug allowing users to clear the Vendor Report Name and Receipt Date values in Assessment Planning after a report has been loaded
  • Fixed a bug causing risk analysis to fail when there are no foreign crossings for the line being analyzed
  • Fixed a bug where changes to some Integrity Compliance attribute values were not being tracked in audit logging
  • Fixed an incorrect page title in Data Management module
  • Fixed a bug causing a failed analysis when invalid default pipe properties are supplied
  • Fixed an issue causing specific environments GIS alignment to fail because of PIPE_SEGMENT data being supplied to the alignment algorithm

0 Votes


0 Comments

Login or Sign up to post a comment